4MW Landfill Biogas Power Plant in Guangzhou
Publish Time: 2017-06-28 Origin: Ettes News Channel
Project Profile of Gas Power Plant | Project Name | 4MW Landfill Biogas Power Plant |
| Working Area | Guangzhou, China | |
| Gas Fuel | Landfill Biogas Methane (58% CH4) | |
| Genset Type | Modularized container biogas power package | |
| Gensets Number | 4x1000kW Working in Parallel | |
| Actual Output | 3.2MW (Due to Sub-quality of Gas Conditions) | |
| Operating Mode | Parallelly synchronized with mains grid and export energy | |
| Gas Generation Config. | Genset Model | EJ-1000N5 |
| Rated Power | 1000kW | |
| Electric Eifficiency | 38.3% | |
| Gas Engine | CNPC 190 Series H16V190ZLT | |
| Burn Technoiogy | Lean Burn, Excess air factor (Lambda) 1.55 | |
| Cooling Method | Closed Water Cooling by Table Cooler | |
| Alterator | Siemens 1FC6 Series | |
| Contorl System | Intelligent Closed Loop Control, Synchronization Parallel Control ComAp IG-NT | |
| Governor/Actuator | Woodward from USA | |
| Air-Gas Mixer | IMPCO from USA | |
| Ignition System | Motortech from Germany | |
| Spark Plugs | STITT from UAS | |
| Gas Train | Ball Valve, Gas Filter, Pressure Regulation Valve, Pressure Gauge, Solenoid Valve; Make/Brand Germany Chroms, Dungs, Italy Madas etc. | |
| Gas Fuel Consumption | 0.3CBM/kWh | |
| Lub Oil Consumption | <0.5g/kWh | |
| Others | Special Demand | TBA |
| Working Mode | Non-stop Continuous Working, Synchronized With Grid, Export Energy to Mains Grid. | |
| Applications | Government Sponsored, Wate to Energy, Emissions Cutting to protect environment. | |
| Commissioning Year | April 2017 |
· ETTES 4×1MW Modularized Container LFG (Landfill Gas) Engine Generator Power Plant