20MW Coalmine Methane Gas Power Plant in Poland
Publish Time: 2018-01-19 Origin: Ettes News Channel
Project Profile of Gas Power Plant | Project Name | 20MW Coalbed Methane Power Plant(50Hz, 10.5kV) |
| Working Area | Coal Mines, Poland | |
| Gas Fuel | Coalbed Gas (methane content ≤25%) | |
| Genset Type | Open Type Generator | |
| Gensets Number | 20x1.2MW Working in Parallel (18 units work, 2 units backup) | |
| Actual Output | 20MW | |
| Operating Mode | Parallelly synchronized with mains grid and export energy | |
| Gas Generation Config. | Genset Model | EJ-1200N5 |
| Rated Power1 | 1200kW | |
| Electric Eifficiency | 38.5% | |
| Gas Engine | CNPC 190 SERIES H16V190ZLT | |
| Burn Technoiogy | Lean Burn, Excess air factor (Lambda) 1.5 | |
| Cooling Method | Open Water Cooling System by Heat Exchanger + Cooling Tower | |
| Alterator | Siemens JFG Series | |
| Contorl System | Syn. Parallel Control Deepsea ComAp IG-NT | |
| Governor/Actuator | Motortech from Germany | |
| Air-Gas Mixer | Auto, Electrically Controlled, Motortech from Germany | |
| Ignition System | Motortech from Germany | |
| Spark Plugs | Denso or STITT | |
| Gas Train | Ball Valve, Gas Filter, Pressure Regulation Valve, Pressure Gauge, Solenoid Valve; Make/Brand Germany Chroms, Dungs, Italy Madas etc. | |
| Gas Fuel Consumption | TBA CBM/kWh | |
| Lub Oil Consumption | <0.5g/kWh | |
| Others | Special Demand | TBA |
| Working Mode | Non-stop Continuous Working | |
| Applications | By using low concentration coalmine gas, to generate electricity and export to Mains Grid. | |
| Commissioning Year | Sep 2017 |